top of page
GALLERY
PROJECT SNAPSHOTS












Videos
VIDEOS
SURE LOCK PIPE PREPARATION
Video showing preparation phase of 200km, 16”natural gas pipeline project in Colombia using two end-prep machines in tandem with the work performed a customer’s coating facility.
SURE LOCK PIPELINE ASSEMBLY
Videos showing high-speed assembly of 16” natural gas pipeline achieving 6km of assembled pipeline in a single 10-hour shift.
COLOMBIAN PROJECT
Colombian 200km 16” San Onofre–Mamonal natural gas pipeline project.
bottom of page