CLIENTS

SURE LOCK IN COLOMBIA

Overview:

• 460 16” joints assembled using two assembly machines in one 7 hour shift

• Three net months finished opposed to eighteen month welding schedule

SURE LOCK IN RUSSIA

Overview:

• 12” Internally Coated Prepped Pipe

• Three months to completion

• Sure Lock proved to be a minimum of 5x faster than   welding and as much as 10x faster

• Over 50% more cost effective than welding

• Less time, less cost, no sleeves, less diesel, no x-ray (which saves up to 10% of project costs)

• 12” Internally Coated Prepped Pipe

• Three months to completion

• Sure Lock proved to be a minimum of 5x faster than welding and as much as 10x faster

• Over 50% more cost effective than welding

• Less time, less cost, no sleeves, less diesel, no x-ray (which saves up to 10% of project costs)

SURE LOCK IN BAHRAIN

Overview:

• 100km 3” and 4” gathering line system project completed 2010

• Client was Tatweer in a joint venture with Occidental Petroleum.