Overview:
• 460 16” joints assembled using two assembly machines in one 7 hour shift
• Three net months finished opposed to eighteen month welding schedule
SURE LOCK IN RUSSIA

Overview:
• 12” Internally Coated Prepped Pipe
• Three months to completion
• Sure Lock proved to be a minimum of 5x faster than welding and as much as 10x faster
• Over 50% more cost effective than welding
• Less time, less cost, no sleeves, less diesel, no x-ray (which saves up to 10% of project costs)
• 12” Internally Coated Prepped Pipe
• Three months to completion
• Sure Lock proved to be a minimum of 5x faster than welding and as much as 10x faster
• Over 50% more cost effective than welding
• Less time, less cost, no sleeves, less diesel, no x-ray (which saves up to 10% of project costs)
SURE LOCK IN BAHRAIN

Overview:
• 100km 3” and 4” gathering line system project completed 2010
• Client was Tatweer in a joint venture with Occidental Petroleum.